B2/AS1 Durability
How long a building element has to keep meeting the Building Code: Table C.1.1.1's 50, 15 and 5 years for the elements it names, Figure 2.1.1.2's steps for those it does not, and Part 3's standards for concrete, steel, timber and the rest. What an element may be made of for that period is E2/AS1's Table C.1.1.1A.
- B2/AS1Third Edition28 Jul 2025
- E2/AS1Fourth Edition28 Jul 2025
- Building Product SpecificationsFirst Edition Amendment 12 Apr 2026
- F4/AS1Third Edition Amendment 21 Jan 2017
Durability, Table C.1.1.1
The period each nominated building element has to last, not less than, by what it is and where it is. Look an element up here first; Figure 2.1.1.2, on the Assessment face, is for one the table does not name.
| Situation or function | 50 yearsor more | 15 yearsor more | 5 yearsor more |
|---|---|---|---|
| Acoustic elements | |||
| Covered by or integral with structural elements or bracing panels | |||
| Behind non-structural claddings or linings | |||
| Surface mounted | |||
| Balustrade | |||
| All | Refer to safety barrier | ||
| Battens (Cavity battens for wall cladding systems) | |||
| Where wall cladding durability requirement is 15 yearsBattens | |||
| Where wall cladding provides bracingBattens | |||
| Bracing elements | |||
| All situationsAll including the bracing element and fixings | |||
| Building wraps (see also wind barriers) | |||
| Access requires removal of roof tiles or structural elementsRoof underlay | |||
| Where roof cladding durability requirement is 15 yearsRoof underlay | |||
| Where wall cladding durability requirement is not less than 50 years (for example, those providing bracing, or where the cladding is very durable such as brick veneer)Wall underlay | |||
| Where wall cladding durability requirement is 15 yearsWall underlay | |||
| Providing bracing (rigid wind barriers)Wind barriers | |||
| Not providing bracing (non-rigid wind barriers)Wind barriers | |||
| Cladding (including jointing systems) | |||
| StructuralRoofE2/AS1 Table C.1.1.1A | |||
| Non-structuralRoofE2/AS1 Table C.1.1.1A | |||
| Structural including bracing elementsWallE2/AS1 Table C.1.1.1A | |||
| Non-structuralWallE2/AS1 Table C.1.1.1A | |||
| Curtain walling | |||
| All situationsFrames and fixings | |||
| All situationsGaskets, glazing or panelling, and beads | |||
| All situationsInternal hardware | |||
| Damp-proof course (DPC) | |||
| Under structural framingDPCs under timber members | |||
| Under non-structural framingDPCs under timber members | |||
| Damp-proof membranes (DPM) | |||
| DPMs under concrete floor slabsDamp-proofing generally | |||
| DPMs applied to the top of concrete slabsDamp-proofing generally | |||
| DPMs behind retaining walls used for landscapingDamp-proofing generally | |||
| DPMs designed for ready access and replacementDamp-proofing generally | |||
| DPM behind tilesDamp-proofing generally | Same durability as the tile covering it.1 | ||
| Tanking, except those designed for ready accessWater-proofing of basements | |||
| Tanking designed for ready accessWater-proofing of basements | |||
| Decking (timber) | |||
| Structural (such as bracing diaphragm)Decking | |||
| Non-structural strip deckingDecking | |||
| All situationsSub-floor structure | |||
| Demountable partitions | |||
| All partitions including frame, fixings, and liningPartitions | |||
| Doors (including frame) | |||
| InternalNon-fire rated doors | |||
| ExternalNon-fire rated doors | |||
| Furniture and hardwareNon-fire rated doors | |||
| InternalFire rated doors | |||
| ExternalFire rated doors | |||
| Furniture and hardwareFire rated doors | |||
| Electrical work | |||
| Buried in or under concrete slabs or behind structural linings without ductsWiring | |||
| Concealed behind linings or in complex ducts or conduit, or surface mounted in conduitWiring | |||
| Wires in easy to access ductsWiring | |||
| Concealed and moderately difficult to access or replaceFittings | |||
| Surface mountedFittings | |||
| Difficult to access or replaceDucting or conduit | |||
| Moderately difficult to access or replaceDucting or conduit | |||
| Fire rated walls | |||
| Structural walls including bracing elements | |||
| All others | |||
| Fixings | |||
| Used to fix structural or difficult to replace building elementsNails and screwsE2/AS1 Table C.1.1.1A | |||
| Under water-proof membranesNails and screwsE2/AS1 Table C.1.1.1A | |||
| Under roofing membranesNails and screwsE2/AS1 Table C.1.1.1A | |||
| Used to fix non-structural or moderately difficult to replace building elementsNails and screwsE2/AS1 Table C.1.1.1A | |||
| Used to fix building elements that are difficult to access or replace or that are structural (including structural elements of decks and barriers)Bolts | |||
| Used to fix non-structural or moderately difficult to replace building elementsBolts | |||
| All situationsBrick ties and fixings | |||
| Used to fix structural or difficult to replace building elementsProprietary fixings | |||
| Used to fix non-structural or moderately difficult to replace building elementsProprietary fixings | |||
| Used to fix structural or difficult to replace building elementsAdhesives | |||
| Used to fix non-structural or moderately difficult to replace building elementsAdhesives | |||
| Used to fix accessories, door furniture and hardwareFace fixings | |||
| Flashings | |||
| All flashings to roof cladding, flues and other roof penetrationsRoof, wall, or windowE2/AS1 Table C.1.1.1A | |||
| Requires the removal of cladding above the roof to be replacedRoof, wall, or windowE2/AS1 Table C.1.1.1A | |||
| Hidden flashings such as behind brick veneer, stucco, or spandrel panelsRoof, wall, or windowE2/AS1 Table C.1.1.1A | |||
| Visible and does not require the removal of the cladding to be replacedRoof, wall, or windowE2/AS1 Table C.1.1.1A | |||
| Requires the removal of the cladding to be replacedRoof, wall, or windowE2/AS1 Table C.1.1.1A | |||
| Flooring sheet or strip | |||
| Floor bracing diaphragm | |||
| Flooring laid under bottom plates | |||
| Flooring laid between bottom plates | |||
| Floor coverings | |||
| Protective or acoustic coverings | |||
| Flue systems | |||
| Those built into the floor, wall, ceiling, or roofAll flue systems | |||
| Those exposed to view or penetrating the floor, wall, ceiling, or roof through a sleeveAll flue systems | |||
| Framing | |||
| All | Refer to wall framing or roof framing | ||
| Guttering and downpipes | |||
| Gutters or downpipes incorporated within the structure (such as downpipes cast into a column or boxed in behind claddings), or secrete gutters (such as hidden verge or valley gutters) | |||
| Internal or valley gutters, fascia gutters or built-in downpipes | |||
| External gutters or downpipes | |||
| Heating appliances | |||
| FreestandingSolid fuel | |||
| InbuiltSolid fuel | |||
| FreestandingGas | |||
| InbuiltGas | |||
| Permanently wiredElectric | |||
| Insulation | |||
| All situationsSub-floor | |||
| All situationsWalls | |||
| Skillion roofCeiling or roof | |||
| Accessible ceiling or roof spaceCeiling or roof | |||
| Interior wall linings | |||
| Structural linings (for example, bracing elements) | |||
| Shower linings (excluding behind tiled showers) | |||
| Linings behind tiled showers | Same durability as the tile covering it.1 | ||
| Easy to access and replace | |||
| Lintels | |||
| All situationsSteel angle (brick veneer) | |||
| All situationsFlat steel | |||
| Plumbing and piping | |||
| Cast into concretePiping and fittings | |||
| Under slabsPiping and fittings | |||
| Installed in a masonry cavity and not ducted or provided with maintenance accessPiping and fittings | |||
| Concealed behind wall linings or installed in maintenance ductingPiping and fittings | |||
| Surface mounted and easy to replacePiping and fittings | |||
| Concealed or moderately difficult to replaceValves | |||
| Surface mounted and easy to replaceValves | |||
| All situationsFixtures | |||
| All situationsOutlets | |||
| Protective coatings | |||
| Paint systems that are difficult to access or replace | |||
| Roofing membranes | |||
| Paint systems that are easy to access and replace | |||
| Roof framing | |||
| All Including trusses, purlins, tile battens, and bracing members | |||
| Roofing tile battens | |||
| All situations | |||
| Safety barriers (balustrade, baluster, and handrail) | |||
| All situationsSupport posts, handrails | |||
| All situationsBalusters | |||
| Septic tanks | |||
| Built into or under the structure of a building | |||
| Easy to access units (such as in-ground but accessible units) | |||
| Effluent field | |||
| Stairs and ladders | |||
| All situationsStringers | |||
| Difficult to replaceTreads | |||
| Moderately difficult to replaceTreads | |||
| All situationsLadders and rungs | |||
| Tiling | |||
| Tiling in wet areas including showersWalls and floors | |||
| Decorative finish onlyWalls and floors | No durability requirement under the Building Code.2 | ||
| Under-floor heating | |||
| Buried in concrete slabsHeating coils | |||
| Accessible coilsHeating coils | |||
| Buried in concrete slabsCables and fittings | |||
| Accessible cables and fittingsCables and fittings | |||
| Vapour barriers | |||
| Behind structural elements or difficult to access and replace | |||
| Behind non-structural internal linings | |||
| High gloss paint finish | |||
| Ventilation | |||
| All situationsPlant | |||
| Built-in ductingDucting | |||
| Easy to access and replaceDucting | |||
| All situationsFittings | |||
| Vermin proofing | |||
| Built into structure | |||
| Moderately difficult to access or replace | |||
| To drained ventilated cavity | Same durability as the cladding covering it.3 | ||
| Water heaters | |||
| Moderately difficult to access or replace (for example, installed in a cupboard)Continuous flow heaters | |||
| Easy to access or replace (such as on internal or external wall)Continuous flow heaters | |||
| Moderately difficult to access or replace (for example, installed in a cupboard)Storage water heaters | |||
| Easy to access but moderately difficult to replaceStorage water heaters | |||
| Wall framing including dwangs or nogging | |||
| Load-bearing framingTimber or steel | |||
| Easy to access lined, non-load-bearing partitionsTimber or steel | |||
| Easy to access unlined, non-structural partitions or non-load-bearing demountable partitionsTimber or steel | |||
| All situationsStructural steel | |||
| Windows | |||
| Structural unitsFrame and interior reveals | |||
| External window/door joineryFrame and interior reveals | |||
| Internal window joineryFrame and interior reveals | |||
| Moderately difficult to access or replaceGaskets, glazing, and glazing beads | |||
| Hardware | |||
- the element in this situation lasts not less than this long
- a note in place of a period: the element takes another's, or has none
- in mono under a row: E2/AS1 Table C.1.1.1A gives the zones its material lasts this long in
- ≠ and a number: the documents say different things here. They are set out under the table, in the same order on every durability table
- Same durability as the tile covering it.
- No durability requirement under the Building Code.
- Same durability as the cladding covering it.
Where the documents differ
Hidden is not always 50 yearsE2/AS1 · B2/AS1
E2/AS1 Table C.1.1.1A's note (3) says hidden elements require 50 years under the Building Code, and exposed and sheltered ones 15; the table itself heads one column 15 years and one 50 years for hidden elements, and prints both against every hidden row: hot-dip galvanised nails hidden are acceptable in zones B, C and D for 15 years and B and C for 50. B2/AS1 Table C.1.1.1 does not divide by what shows. It gives 15 years to wall underlay where wall cladding durability requirement is 15 years, to cavity battens where wall cladding durability requirement is 15 years, and to nails and screws used to fix non-structural or moderately difficult to replace building elements, which takes in nails punched and puttied under paint, the fixings E2's note (6) counts as hidden. Under both, B2.3.2 asks a hidden element to last at least as long as the element hiding it.
E2/AS1 Table C.1.1.1A note (3), E2/AS1 Table C.1.1.1A note (6), B2/AS1 Table C.1.1.1, NZBC B2.3.2
A flashing's period: what replacing it takes, or what showsB2/AS1 · E2/AS1
B2/AS1 decides a flashing by what replacing it takes: 50 years where the cladding, or the cladding above a roof, has to come off to replace it, whether or not the flashing shows; 15 years where it is visible and does not. E2/AS1 decides by what shows: note (3) reads exposed and sheltered elements at 15 years, and the COMMENT to 4.2.1.1 gives 15 years to flashings exposed, partially exposed or accessible. A head flashing that shows below the cladding it is lapped under is 50 years by the first reading and 15 by the second.
B2/AS1 Table C.1.1.1, E2/AS1 Table C.1.1.1A note (3), E2/AS1 4.2.1.1 COMMENT
No column for an element that shows and needs the longer periodB2/AS1 · E2/AS1
B2/AS1 gives 50 years to elements that are not hidden: a roof or wall cladding that is structural or provides bracing, and a flashing replaced only by removing cladding. E2/AS1 Table C.1.1.1A heads its 50-year column for hidden elements only, so its exposed and sheltered columns go no further than 15 years. E2/AS1 answers the longer period in its own text for one cladding alone: plywood used as bracing, at 9.8.9.2.
B2/AS1 Table C.1.1.1, E2/AS1 Table C.1.1.1A, E2/AS1 9.8.9.2
Assessment, Figure 2.1.1.2
For a building element Table C.1.1.1 does not name. Five steps, each deciding or passing to the next; a question appears once the steps before it have passed.
Figure 2.1.1.2 is a means of assessment, not a lookup; an element Table C.1.1.1 names has its row there.
Does the element have to satisfy another clause of the Building Code?
A decorative finish or trim that no clause asks anything of has no durability requirement. One that also serves a purpose a clause does (the impervious, easily cleaned surface of a wet area) has the durability of that purpose.
- Durability, not less than
- –
B2 notes for the drawings
The requirements of Parts 2 and 3, numbered, so a note can be pasted onto a sheet as it stands. The periods by element are on the Durability face.
Every B2 sheet
- Durability periods Every building element that has to satisfy another clause of the Building Code continues to satisfy it for not less than 50 years where it provides structural stability, is difficult to access or replace, or would fail without anyone noticing in use or maintenance; 15 years where it is moderately difficult to access or replace, or its failure would show in normal maintenance; and 5 years where it is easy to access and replace and its failure would show in normal use, or for the building's specified intended life, where that is shorter.
2.1.1.1, Figure 2.1.1.2, Figure 2.1.1.2 note (1)
- Hidden elements An element hidden by another lasts at least as long as the element that hides it: brick ties behind a masonry veneer take the veneer's life, not the cladding period.
C.1.1.1 COMMENT, NZBC B2.3.2
Generic building elements
- Concrete Concrete building elements to NZS 3101.1 Section 3. Its provisions in non-specific or unquantified terms (special studies, manufacturer's advice, methods that are appropriate, adequate, suitable or the like) are not part of the Acceptable Solution and are an alternative solution.
3.1.1.1
- Structural steel Steel structures and components to SNZ TS 3404, within its scope.
3.2.1.1
- Light steel framing Light steel framing to clause 3 of NASH Standard Part 2, within its scope, with its clause 3.1 replaced: steel framing, brackets and fixings for walls, roofs and mid floors are within a closed building envelope performing at least as well as one to E2/AS1, and eaves are lined.
3.2.2.1
- Timber treatment Timber and wood-based building elements treated to Building Product Specifications Subsection 3.5.1 where not less than 50 years is required and Subsection 3.5.2 where 15 years is required, or to NZS 3604 with NZS 3602 and NZS 3640 as those two subsections modify them.
3.3.1.1
- Untreated Douglas fir framing Preservative-free solid Douglas fir only for roof members and wall framing protected from the weather, and floor members protected from the weather and ground atmosphere, in a stand-alone single household unit of no more than 2 storeys to NZS 3604; in a wind zone no higher than high; with envelope complexity no higher than medium risk and deck design no higher than low risk, and a risk matrix score of no more than 6 on every external wall face, all to E2/AS1; drained and vented cavities to E2/AS1 behind every cladding; roof and wall cladding systems and details to E2/AS1; a simple pitched roof draining straight to external gutters, with no internal, secret or concealed gutters and no roof element ending inside the external walls; a roof slope of at least 10°; corrugated iron, or concrete, metal or clay tiles on a skillion roof; and eaves of at least 450 mm on a single storey house and 600 mm on a two storey house.
3.3.2.1
- Solid plastering Cement plaster for walls, ceilings and soffits to NZS 4251.1, within its scope.
3.4.1.1
- Earth buildings Earth buildings to NZS 4297 and NZS 4299, within their scope.
3.4.2.1
- Insulating glass units Insulating glass units to NZS 4223.2, with its clause 5.3 replaced: each unit permanently and clearly marked with the manufacturer's or supplier's name or trademark, the year of manufacture at least, and “Complies with NZS 4223.2:2016”; visible once installed, legible and durable for the unit's life; etched or laser marked, never an adhesive label.
3.4.3.1
- Normal maintenance The specifier of each element states its normal maintenance, which includes following the manufacturer's recommendations, washing down exterior surfaces exposed to wind-driven salt spray, recoating protective finishes, replacing sealants, seals and gaskets, replacing valves, washers and similar parts, cleaning and replacing filters, servicing plant and emergency equipment, and keeping access, escape and hazard signs, with periodic inspection of spaces not seen without effort.
2.2.1.2, 2.2.1.3
B2: what to show on the drawings
What has to be drawn or named for the durability of the design to be checked. Tick as you go; the ticks print, the guidance does not.
B2 requirements to show on the drawings
- Table C.1.1.1, Figure 2.1.1.2
- 3.3.1.1
- Table C.1.1.1, E2/AS1 Table C.1.1.1A
- Table C.1.1.1
- 2.2.1.2, 2.2.1.3
- Figure 2.1.1.2 note (1)
- 3.3.2.1
- 3.2.2.1
- 3.4.3.1
Terminology
The words the periods lean on, defined where the documents define them.
- Building elementAppendix B
- Any structural or non-structural component or assembly incorporated into or associated with a building: fixtures, services, drains, permanent mechanical installations for access, glazing, partitions, ceilings and temporary supports included.
- Specified intended lifeAppendix B, Building Act 2004 s 113(3)
- The period, stated in the application for building consent or in the consent, for which the building is proposed to be used for its intended use. No element has to outlast it.
- Normal maintenance2.2.1.1
- The work generally recognised as necessary for an element to achieve its expected durability, depending on the material or system, where the building is and where the element is in it; it can include replacing parts that wear fast. It does not include upgrading to new technology or new expectations.
- Scheduled maintenance2.2.2.1
- The inspection, maintenance and reporting of the elements on a compliance schedule under section 100 of the Building Act. Those elements are in effect required to last the life of the building, because they must perform as designed at all times; their maintenance may include replacing them.
- Hidden, exposed, shelteredE2/AS1 Table C.1.1.1A note (3)
- E2/AS1's words for where a material is, not B2's: hidden is concealed behind another element with no part visible; exposed has surfaces washed by rain; sheltered is visible but not rain-washed, and an element that is both is sheltered. B2/AS1 has no such division; its rows say what an element does and how hard it is to replace.
- Primary and secondary elementAppendix B
- A primary element provides the structure's basic loadbearing capacity, and its failure in a fire may start instability or collapse; a secondary element does not, and its failure will not.
Reading B2
Why the document reads as it does, and how it meets E2/AS1. Where the two say different things is on the Durability face, under the table. Screen only; none of it is a note.
B2 beside E2
- Two questions, two tablesE2/AS1 2.1.1.1, E2/AS1 C.1.1.1, Table C.1.1.1
- E2/AS1 2.1.1.1 asks three separate things of the building envelope: a) that it meets B2, b) that its materials suit their end use, location and environment by Table C.1.1.1A, and c) that they are compatible. B2/AS1 Table C.1.1.1 answers how long; E2/AS1 Table C.1.1.1A answers what a cladding, flashing or fixing may be made of to last that long in the site's exposure zone. B2 names no material; E2 names no period of its own.
- Protective coatings agreeTable C.1.1.1, E2/AS1 9.4.9.2 COMMENT
- A paint system easy to access and replace is 5 years in B2's table, and E2/AS1 9.4.9.2's COMMENT states the same minimum for protective coatings.
- E2 sends timber to B23.3.1.1, E2/AS1 6.1.1.4, E2/AS1 7.1.2.1, E2/AS1 9.1.7.8 d), E2/AS1 9.1.9.4
- E2/AS1 asks parapet framing and packers, deck timber and pergolas, cavity battens and jamb battens to comply with B2/AS1, and B2/AS1 3.3.1.1 hands the treatment to the Building Product Specifications by period. So a cavity batten's treatment follows the cladding's period: 15 years behind a non-structural cladding, 50 behind one that braces.
- Masonry veneerTable C.1.1.1, E2/AS1 Table 9.2.7.1A, E2/AS1 Table 9.2.9.4A
- Brick ties and their fixings, and steel lintels over veneer openings, are 50 years in every situation. E2/AS1 Tables 9.2.7.1A and 9.2.9.4A then give the durability class of tie and lintel by exposure zone, which E2's Claddings face reads.
- B2 reads E2's risk matrix3.3.2.1 c), 3.3.2.1 f), E2/AS1 Table 3.1.3.1
- 3.3.2.1 is the only place B2/AS1 uses E2/AS1's scores: untreated Douglas fir framing needs envelope complexity and deck design low enough, and no external wall face scoring more than 6. E2's Risk matrix face scores each face and can be saved elevation by elevation.
- No exposure zone in B2E2/AS1 Table C.1.1.1A note (1), NZS 3604:2011 Section 4
- B2/AS1's periods do not change with the site. The site enters through E2/AS1 Table C.1.1.1A, whose zones are NZS 3604 Section 4's with E2's own Zone E added, and through NZS 3604's fixing tables.
The table and the figure
- The table, then the figure2.1.1.2, 2.1.1.3
- 2.1.1.2 offers Figure 2.1.1.2 as a means of assessing a period and 2.1.1.3 says Table C.1.1.1 can be used to establish one for the elements it names. Neither says which governs where they differ. This tool shows the table's period for a named element and uses the figure only for an element the table does not name.
- Insulation in an accessible roof spaceTable C.1.1.1, 2.1.1.1 b), 2.1.1.1 d), Figure 2.1.1.2 Step 4
- The table asks 50 years of insulation in every situation, an accessible ceiling or roof space included. By the figure's steps an element easy to reach, whose failure a maintenance inspection would find, stops at 15 years; 2.1.1.1 d) gives insulation as an example only in a skillion roof. The table's row stands.
- Concealed electrical fittingsTable C.1.1.1, 2.1.1.1 b)
- Electrical fittings “concealed and moderately difficult to access or replace” are ticked at 50 years, where 2.1.1.1 b) gives moderately difficult access 15. The figure reaches the longer period only through Step 4 a), failure nobody would notice, which the row's word “concealed” may be taken to say. The table's row stands.
- A barrier's posts, balusters and boltsTable C.1.1.1, Definitions, F4/AS1 1.2.1, F4/AS1 Figures 1 and 2
- A safety barrier's support posts and handrails are ticked at 50 years and its balusters at 15, and the bolts fixing structural parts of a barrier at 50. The Definitions make a baluster a post that supports the top and bottom rails, which is what a support post does, so the words do not settle which member the 15-year row means. F4/AS1's Figures 1 and 2 draw the pieces between the rails as infill rather than as posts, and a barrier detailed to them has members the table does not name.
- A note in place of a tickTable C.1.1.1 notes (1)–(3)
- 4 rows carry a note number in all three columns instead of a tick. A damp-proof membrane behind tiles and a lining behind a tiled shower take the tile's period, vermin proofing at a drained ventilated cavity takes the cladding's, and tiling that is a decorative finish only has no durability requirement under the Building Code.
- Empty cellsTable C.1.1.1
- Roof framing and window hardware have no situation printed; tiling's decorative finish row has no component printed and is read under Walls and floors, the one above it. Balustrade and Framing have no period of their own and send the reader to Safety barriers, and to Wall framing or Roof framing.
Scope
- Materials, components and what serves two purposes1.1.1.1, 1.1.1.1 COMMENT
- B2/AS1 applies to materials and components required to meet another clause. An element no clause asks anything of (a decorative coating, trim) has no durability requirement; one serving two purposes has the durability of the one a clause requires.
- Outside the Acceptable Solution1.1.2.1, 1.1.3.2
- An element used outside the scope a referenced document gives it, or a design that cannot follow B2/AS1 in full, is verified by B2/VM1 or shown by an alternative solution.
- Specified systems2.2.2.1
- Elements on a compliance schedule are in effect deemed to last the life of the building, because their inspection and maintenance keep them performing at all times, replacement included. Table C.1.1.1's periods are not what governs them.
- Douglas fir is for houses3.3.2.1 COMMENT
- 3.3.2.1 is offered for people who do not want chemically treated timber in their home. For commercial and other buildings, untreated Douglas fir is outside the Acceptable Solution and considered case by case.
Resources